MVP Client Backlog — Phase 5

Status: completed. Master tracking issue #56 is closed; child issues #44-#55 and backend prerequisites #62 and #66 are closed as completed. The final frontend hardening PR was merged as #73.

This backlog turns Phase 5 — MVP client / product UI into incremental, independently mergeable work against the existing, stable backend contracts (issues #19–#27, all merged to main). No backend change is expected to support this phase; if one turns out to be genuinely necessary, it is scoped as its own small issue rather than folded into a frontend one.

Master tracking issue: #56 (closed).

Why this phase exists

The roadmap previously went straight from Phase 4 (Administration) to what is now Phase 6 (QR entry point, push notifications, messaging). This backlog inserted the missing step: build the resident- and administrator-facing product UI against the backend that already exists.

Issues

# GitHub issue Issue Depends on Status
1 #44 Application shell, design system foundation and API client — Completed
2 #45 Authentication, session persistence and route guards #44 Completed
3 #46 Resident context, amenities and availability browsing #45 Completed
4 #47 Leisure reservation flow (shared/exclusive) #46 Completed
5 #48 Event reservation flow (slots + add-ons) #46, #62 Completed
6 #49 Payment flows (Mercado Pago + cash) #47, #48 Completed
7 #50 Resident reservation history and detail #49, #66 Completed
8 #51 Administrator shell and dashboards (read models) #45 Completed
9 #52 Administrator reservation operations (cancel/reschedule) #51 Completed
10 #53 Administrator configuration (pricing/availability/event slots) #51 Completed
11 #54 Audit trail and payment manual-review views #51 Completed
12 #55 Frontend testing, accessibility and error handling #44-#54 (incremental) Completed

Issues #62 and #66 were added and completed as narrow backend prerequisites discovered during Phase 5: resident-facing Event slot discovery and resident-owned reservation/payment reads.

What stays out of this phase

Deferred product scope after issue #2 closure

Issue #2 is now closed for MVP/pilot policy. Concretely:

Definition of Done (applies to every issue below)